Clients


Site: Merrill Lynch, Cheapside EC2

Contracted to mace Ref: Steve Burrows, Garrett Weir, Jim Trask.


External Works: Techcrete UK


Carry out all Natural stone repairs using various methods, each presented with method statements. Some operations include the use of electrical equipment, (cutting, spinning, drilling and power washers). All the above works undertaken are uniformed throughout every external elevation to a high finish. Some pre cast panels were clad with red bricks these needed the above alterations as well as brick replacements generally due to discolouration damage or problems incurred during the manufacturing process. As a result interest was taken to the re pointing of various panels to which a method statement covers each stage.







Spacetek:  Ref/ Peter Bustin


Carried out various curtain - walling operations. Both internal and external within the two main glass atriums. Assembly, installations, wet seals and general engineering specifications undertaken.




Connaught Cleaning PLC: Ref/ Dave Avears


Having the only method of access at the moment in time, various cleaning projects were undertaken i.e. glass, stainless trims, powder coated soft panels, alloy braces, stonework internal and external finished to high standards.





T.Clark PLC: Ref Pat Jackson


Installation of electrical light enhancement equipment mechanically fixed to steel supports within an expansive glass atrium, with operational office area below.





Swift Horseman: Ref Bob Sunnit/ Martin Voller


Cleaning projects undertaken, to remove render from coping panels and other fittings. Install silicon sealants of various colours, tooled to agreed finishes. Install two meter lengths of powder coated capping panels throughout the South atrium.





Atlantic House, Farringdon Road, EC2

Contracted to Skanska Ref/ Roman Kirbybuk, Lee Stacey & Asgar Chouglay

In coordination with Benwall Fixing Company Ref/ Sam, Ian, Chris & Steve


Curtain Walling installation, replacement and remedial work undertaken using specialist access. With a constant liaison with Skanska and Benwall we combined skills and experience to address and overcome various problems throughout the building. Relevant method statements prided by G.T. ROPE ACCESS Ltd supported all operations undertaken.


Using a team of abseil operatives equipped with two way radios and digital cameras we successfully carried out a process of de-glazing and glazing safely and efficiently without the use of a house cradle. With the use of a mobile cannon, seated on the house cradle track we attached a block and tackle, hooked onto a rechargeable power sucker, which enabled units to be raised and lowered, glazed or de-glazed. Banking and rope management skills ensured high and low level safety during all operations. This procedure enabled the glazing program to regain its target within a four-day period.


Various sealant modifications were introduced and installed throughout the building, such as glass-to-glass units, horizontal and vertical joints to be tooled flush, not recessed as fitted. Part of our remedial package was to cut out meters of sealant and conpreband, then reinstall as instructed. During all sealant operations, sheets of cordex protection were used on all stonework, low-level canopies, paving stones and terrace flagstones then disposed of. With combined efforts from Benwalls, Skanska, Mace, and G.T.ROPE ACCESS Ltd, Atlantic House is without any further weathering problems!






Benwall Fixing Co Ltd



Faber Blinds : Chris Cosford / Chris Foley


E.A.G Sealents / Northampton


Install Corking and Sealants to internal glass atrium and commission all existing applications. Install and commission electric blinds within a glass atrium. Drill tap and fix to steel overhead box section steel using electrical tools and equipment.




Stuart Brown Partnership / Lovells / Gemma Chamen


Dismantle and remove non commission electric blinds from horizontal glass roof.




Gormley Marble Specialists / Paul Keenan


Triton Square


Carry out snagging as instructed on seven, thirty meter granite columns.




Gormley        Marble Specialists Ltd


Mace / Geff Charlotte


Dismantle and de-rig internal (façade hoist) house Cradle using industrial rope access equipment.




Benwall Fixings/ Barry Bennet/ Portugal Street WC2


Install external facade panels using rope access and various rigging techniques. All work catalogued on digital imaging equipment, and emailed as requested.



Benwall Fixing Co Ltd


Stuart Brown Partnership / Lovells/ Alan Clarke


Contract Glass Cleaning, Sealant Applications, Snag and Repair Armour coated plaster.





Ellmer Construction


Assist in Rigging and transporting heavy duty lifting equipment to and from various levels within a 50 meter high glass atrium.





Atlantic House EC2


Armour Coated Plaster LTD - Commission polished Plaster in main entrance of Lovells main building using industrial Rope Access.




Phoenix Electricals/ Phil Nelson


Carry out maintenance repairs and commission internal & external lighting equipment.




Angela Conner / Fellow of the Royal Society of British Sculptors


Over a period of six months, our team work has made it possible to install Europe's tallest indoor water themed sculpture at Lovells in London.

GT Rope Access has had a high level of involvement to all planning, organization and operations undertaken to this package:


- Extensive Rigging

- Lifting of equipment & materials using pulley systems.

- Installing house cradles for welding equipment and operatives.           

- Load Testing each part of the sculpture as it is erected using lead weights and recording each alteration made.           

- Carry out cutting, grinding and fabrication welding.           

- Using tools & equipment and assemble all fittings and components.

- All the above works were completed using Industrial Rope Access.





Royal        British Society of Sculptors


ST Giles Court, ST Giles Circus, WC2


- Remedial works to external window units           

- Carry out reinforcement with stabilizer to each window unit and remove all instable concrete, brickwork and rebar           

- Patch repair and apply slurry coating uniform throughout           

- Remove corroded rebar / core drill / stainless dowels and chem-fix various areas           

- A complete photographic data report and elevation drawings supplied on completion





JOSEF GARTNER AND CO LTD

Jamie Ross, David Morgan.


- Tower Place, Tower Hill London EC3

- Create Access and install specific panels of stone to levels 1-5 around Waagner Biro Cables

- Penetration on East Building. Fit external facade trims and Bree-Soleils as instructed By Jamie Ross. Install Hauling systems all supported by method statement and risk assessments.








Skanska UK Build


Contract: Roman Kirycuk

Swiss Re / Baltic Exchange Redevelopment

ST Mary's Axe

London EC2


- Swift Horsman / Dave Kelly

- Lightweight Plastering / Ron Meadwell

- Install various Rope Systems within two riser shafts from levels 36 to 1 using Confined Space Guidelines.

- Scope of Work. Installation of Rockwool and fire retardant sealant products to internal service hatches. Carry out numerous dry walling repairs and commission all internal installations









Pearce Group LTD

Contact: Paul Dean, David Mortimer

Pearce Leisure, Royal Victoria Dock, London E16 2BU


Travel INN


- Using Specialist Rigging Equipment we successfully installed a selection of coloured sealants from levels 6 to Ground.





Haymills Contractors

Contact: JOE Breckon


Science Museum, Queensgate, London SW7


- Carry out various sealant applications over a 5 week period until completion

- All areas smoke tested to 0.9 Pascals / m2





Skanska UK Build

Swiss Re, St Mary's Axe, London, EC2

Contact: Asgar Chouglay


Baltic Exchange Redevelopment.


Create Access in each set of six pack atrium areas situated on levels 4-10, 15-21 and 22-27, plus various two story atria around the building. Install three types of stainless steel bolt-on and clip assembly fixings to atrea beams and bow tie levels. Each fixing to be installed as instructed by street crane express.

A total of 1700 components to be fitted as part Program to install an Internal mobile access rigging system over a 5 week period.








AWS Commercial windows limited

Contact: Robin Depper

Bryer Group Plc

Contact: Carl Abrahams and Jamie Ross


Winter Garden House, Mackin Street, London WC2


Create roof top access and carry out removal of various glazed sash units. Commission reinstall, and install various sealant applications





Fireclad Limited

Contact: David Flynn and Paul Mc-Quin

Mace Project Contact Steve Burrows


Time Square Project, Blackfriars, Queen Victoria Street, EC4


Install various rigging and haulage systems in four dry riser shafts, each 7 levels high with door opening on each level. Mechanically fit, brackets, steel lanyards and adjustable solid weight systems to ensure doors remain closed throughout extensive fire testing.








Skanska Build UK

Contact: Asgar Chouglay and Decklan Gormley


Swiss Re, St Marys Axe, EC2


Create access to 24 static portable cabins stacked four high. Install a master system fishing eye bolts each linked with kermantle ropes providing a working perimeter safety line. Using various spanners, sockets and wrenches remove all bolts, brackets and side panels to each cabin.

Sling removed materials on lower to ground level using pulley system and GT Banksmen





Hindwoods Hunter Payne Limited, Chartered Surveyor, Syndenham High Street


Contact: Chris Withersgreen and Richard Bellamy


Carry out monumental stone restoration, re-pointing, brick replacements, acid cleaning, water proof render applications and various guttering modifications. Restore concrete moldings and terracotta detail.





Skanska Build UK

Swiss Re Building

Contacts: Asgar Chouglay and Ian Perry

Sandbergs Engineering James Kern Tony Pitman


- A rope access project requiring a team of five technicians for a five month period.           

- Carry out load testing to each and every abseil attachment anchor point listed above and to include all side traversing trolley rail systems built into each two pack and six pack upper floor - Lifting equipment consisting of turfors, long chain block and tackles, shackles, material slings, pallet trucks and custom made parapet lifting and access platforms           

- Sandbergs Engineering responsible for supervising and monitoring the testing.








Benwall Fixings Ltd Charter House,

Faringdon Rd, London

Contact: Barry Bennett


- Rope access sealant application



Benwall Fixing Co Ltd



JOSEF GARTNER AND CO LTD

Contacts: Jaimie Ross, David Morgan


Tower Place, London


- Gain access to underside of external canopy           

- Create hauling system to install 50kg natural stone panels around Wagner Biro’s penetrating cables from levels 1 – 5 on east building








UBS Warburgs

Finsbury Avenue London EC2

Brian Scott


- Create access to ceiling of main entrance hall           

- Electrical work to commission overhead hi-spec mood lighting units





Lightweight Plastering

Tom Burke

Swiss Re Building, 30 St Mary Axe


- Access to confined space riser shafts by rope access           

- Install fire retardant dry lining and fire stopper applications           

- Dry lining repairs.





Haymills Contractors Ltd

Shaun Bongard


Science Museum, Southgate, W7


- Carry out sealant applications and mortar pointing, air testing

- General making good of external stonework by rope access





Pearce Leisure PLC

Greg Lake


Travelodge, Excel East, Victoria Dock, London E16


Install caulking and various sealant products





Lovell’s / Stuart Brown

Alan Clarke


- Install hauling systems within internal atria to raise materials from ground level to levels 1 -14






Skanska Build UK

Roman Kirycuk

Swiss Re Building

Swift Horsman

Jim McLelland

Lightweight Plastering

Ron Meadwell


- Confined spaces within central riser shafts from ground – level 37 by rope access           

- Install sealants to access hatches at each floor level           

- Provide follow-up photographic inspection







AWS Ltd

Robin Depper


Winter Garden, London WC2


- Carry out inspection of rooftop anchor point

- Carry out removal of various sash windows then replace with double glazed window units

- Install external sealant applications then apply external UPVC glazing strips




Fireclad

David Flynn


Time Square Project, Queen Victoria St, Blackfriars, London EC4


-Confined spaces within riser shafts

- Install internal door brackets with steel cable lanyards attached to weights to ensure each riser door closes correctly to meet fire regulations






Swiss Re Building

Skanska Build UK

Declan Gormley


- Use industrial rope access to dismantle brackets and fixings from three portable in-site cabins stacked 25m high





Swiss Re Building

Schmidlin UK

Ian Gurney


- Access 2 pack and 6 pack atria using OCS person rider system           

- Install M10 tapped bolts and sprung washers and torque set each one           

- System tested and certified





Skanska Rashleigh Weatherfoil Ltd

Northumberland House, London, WC1

Mike Stride


- Carry out repairs to concrete canopies throughout external facade           

- Apply waterproofing products




Swiss Re Building

Asgar Chouglay


- Install temporary marine-ply weatherboarding to missing window units on various levels throughout the building to make weather tight.





Fireclad Ltd

Mark Skinner

Mace Projects

Steve Burrows

RBS, London EC1


- Carry out a complete written and photographic inspection of riser shafts and air conditioning systems from ground to roof levels








Swiss Re Building

Skanska Build UK

Paul Thorogood


- Carry out re-testing to dog leg suspension points and bow tie plates using 4 x 250kg weights - Create hauling system to lift testing equipment into position in atria           

- Testing certificated by Sandbergs Engineering





Swiss Re Building


London Engineering Ltd

Pat Curran


- Carry out alterations to fire blanket and plasterboard to six cooling towers on level 37           

- Reinstall metal trims using Tec screws






Swiss Re Building

Skanska Build UK

Roman Kirycuk


- Use hydraulic access equipment to carry out electrical alterations to main entrance overhead lighting panels





Skanska Build UK

Asgar Chougly

Bury St Building, London EC3


- Carry out sealant applications to flame textured granite panels, tool finish and uniform throughout building





Swiss Re Building

Skanska Rashleigh Weatherfoil

Paul Peck


- Using OCS person-rider system install lighting units throughout each 2 pack and 6 pack atria - Replace and commission all faulty electrical components as instructed by Paul Peck





Skanska Build UK

Paul Thorogood

Valliant House London EC3


- Glass cleaning project  – 7 floors, 3 elevations





Laxcon Construction Ltd

Sam Assani

Penthouse Apartments, Whitechapel London EC2


- Carry out paint applications to external textured render using Webber silicone enhanced acrylic paint





AESA UK Ltd

Access Cradles Ltd

Gerald Gartner

Radisson SAS Hotel, Stanstead Airport


- Carry out mechanical installation of person-rider system accessed by hydraulic scissor lift

- Use advanced rope access aid climbing techniques to install corner brackets





Stonewest Ltd

Steve Warren

Marriot Hotel, London W1


- Cut out existing external sealant from vertical joints between natural stone panels           

- Re-install caulking and apply various sealant products. Tool finish to specification





Skanska UK Build

Paul Thorogood

Valliant House EC3


- Using rope access techniques and hauling systems deglaze window units from level 3 and install new units to specification





Skanska Build UK

Ian Perry, Kevin O’Shea, Gary Lucas

Radisson SAS Hotel, Stansted Airport


- Using internal atria person rider system to redecorate high level steelwork           

- Carry out lighting installations for Peter Ronsford, Peter Burns and Bill Darling






Tubular Erectors Ltd

Radisson SAS Hotel

Andy Scott


- Supply five person rope access team to remove corrosion and spot welds from front screen steelwork, ground – level 4           

- Carry out preparation for and application of three coats of white cellulose paint           

- Apply sealant applications to armour coated internal render





Swiss Re Building

Coflex

ISS Facilities Services Ltd

Angelyn Balleza


- Carry out the removal of all fluorescent light units within 2 pack and 6 pack atrias on each level and replace with alternative coloured tubes





AESA Ltd

Access Cradles

Gerald Gartner


Radisson SAS Hotel, Stansted Airport


- Aid-climb to each corner of the person rider system and install steel stabilizing struts to reduce deflection






Radisson SAS Hotel, Stansted Airport

Jim Bailey


- Set up and adjust ten projection lighting units with GOBO texture slides under supervision of Colin Ball





Gratte Brothers Ltd

Warren Bradshaw

Radisson SAS Hotel, Stansted Airport


- Install high rig stage lighting to internal atria perimeter           

- Carryout final adjustments to laser smoke detector system





Gormley Masonry Services Ltd

London NW10

Ken Pine

Lion Plaza, White and Case Building, Old Broad Street, EC1


- Apply monumental stone repairs to natural stone cladded main entrance and internal walls, ground to level two         

- Works undertaken within a fully occupied forty meter internal atria         

- Using rope access and experienced masonry technicians install all hard pointing stone to stone and sealant applications stone to steel work         

- Work completed in time for clients Christmas party 2004



Gormley        Marble Specialists Ltd         






Jones Lang LaSalle

Marcus Cain

London EC2


Regular Cleaning Services Limited

Barry Herbet

London SE13

Lion Plaza, Old Broad Street, London EC1


- Build clean project within a fully occupied internal atria

- Working along side Amex building management and Fujitec lift engineers to carryout a program of access without disruption to building occupants and there clients

- Access created from the installation of three pairs of elephant trolley plates fitted to house cradle perimeter eye beam track by GT Rope Access Ltd

- Project included maintained to high level louvers / bre solays, vacuum hovering all recessed integral grid designed perimeter steel work using back pack pneumatic hoovers, snagging of sealant applications, cleaning of glass lift cars, perimeter glass, balustrades, stone work, steels, lighting units, lift pits and internal glass canopy all accessed using rope access skills

- A regular maintained contract 2004 onwards








White and Case

Carla Winchester

Lion Plaza, Old Broad Street, London EC1


- Using rope access to create unique work positioning to enable the installation of defused film / manifestation to various internal glass units throughout the building





Humbro Roofing Limited

London EC3

Steven Humbro


Lloyds Register Building London

Gwy Williams


- Supply a team of abseil technicians to remove building material spillages from high level external powder coated alloy cladding panels and make good using products supplied






Schmidlin UK

Ian Cameron

Skanska UK

Peter Pontsford

Coflex

Ritchard Stead

Robin Dinmore


Swiss Re Building Gherkin April 2005


- A bottom hung triangular unit of glass fell 120 meters (400 feet) to the ground plaza without injuring any persons GT Rope Access Ltd was requested to supply a ten person team of rope technicians stabilize window units as instructed by Schmidlin           

- All involved carried out the project in a professional manner avoiding press and reporters and not commenting to tabloid papers throughout the incident.           

- The project required the removal of left and right handed electrical motors powering the opening and closing of all bottom hung window units installed in each two pack and six pack location throughout the building           

- Motors were examined tagged and parceled for shipping back to the manufacturers for commissioning / redesign.           

- Motor units were later returned and installed by Schmidlin UK           

- Following our project completion the GT team were commended for our efforts and rewarded with drinks and canopies courtesy Coflex management








Hindwoods Hunter Payne (Chartered surveyors)

Colin Elliot

Dulwich High Street, SE London


- Install cable ways and blay rope systems to access a lightning damaged spire and steeple situated on a slatted roof           

- Remove damaged turret complete, rebuild to as specified           

- Carryout led work and roofing repair           

- Commission lighting conductor cables and brackets





Skanska UK Build

Palestra Building

Southwark, SE London

Gary Clifford (Project Director)


- Industrial window cleaning project           

- Use roof level overhead structural steelwork to multi-Use rope access on three complete elevations to complete build clean




Skanska UK Build

Radisson SAS Hotel

Stansted Airport

William Brock (Project Director)

Martin Harris (Senior Suveyor)


- Redecoration project using rope access           

- Using ICI specialist paint products, re-paint a prestigious centre piece lift core positioned in the main entrance internal atria           

- All applications to be uniformed           

- Added protection to white marble floors and precautions whilst working within a occupied environment






R & S Fire and Security Limited

John Allsop / Duncan Ross

Mace Solutions Limited

Geof Charlotte / Simon Hudson

British Airways Project, Terminal 5, Heathrow Airport         

Project Location & Task         


Fire Sealing the Compartment Wall between the Goods Hoists and the Fire mans Lift


- Heathrow Airport, Terminal 5, Building A, Compound C.

- Basement 1           

- Apron Level           

- Arrivals Level           

- Gate Seating Level           

- Departures level           

- Mezzanine Level

- Fireman’s Lift Shafts: L100 L97 L90 L89 L85        L83.

- Goods Lift Shafts: L98 L96 L91L88 L84 L82.


GT Rope Access Limited will be a sub contractor to R & S Fire & Security.

Provide two industrial rope access teams each consisting of five operatives each equip with full PPE, equipment and knowledge of project.

Each working pair shall be policed at all times by a multifunctional third team member.

This team configuration provides a project liaison representative responsible for keeping the project on program and problem solving till completion.

An on site policeman ensures the entire work zone is safe and protects all other working operatives along with preparation of all tools, materials and equipment daily.

Two operatives constantly working from ropes, third rigging, de-rigging, attaching materials, tools, equipment, to working ropes on all levels to maintain productivity.

All access equipment, skill cards, and GT Rope Access insurances to be supplied by GT ROPE ACCESS LTD prior project commencement.

In addition all drawings, monitored progress sheets and priority progress reports shall be collated and supplied on completion.

The entire project GT0101 will be photographed and stored on disc for client viewing.

Following our meeting on site with Geoff Charlotte of Mace Solutions Tuesday 3rd August 2005 GT provides alternative access solutions.

GT0101 project shall be undertaken without any ground level disruption, resulting in zero client/building inconvenience.

As agreed this project can only be undertaken during weekdays between the hours of 6am to 6pm.

Installation works to be carried out at a methodical pace whilst handling new materials and power tools, productivity to increase following resourceful problem solving and experience gained.

Create access within two lift shafts each day, (ropes to be deviated to provide optimal work positioning) use electrical tools provided by RNS for example:

- Side winder drills           

- Dry wall screw guns           

- Tek guns (A HILTI DX  ticket required to operate this equipment)           

- Shot fire fixing guns           

- All power tools sourced by 110 volts and certificated           

- Reciprocating saw           

- Grinders and cutting tools (hot works certificates and permits supplied)

- Task lighting and Harris fencing to be installed and customised by a Mace Solutions labour team daily.                   

Materials chosen to be installed are:

- Expanding foam           

- Corking and sealants           

- Hessian/Normex material fire retardant blanket           

- Reeled fine metal sewing cable (to stitch and secure blanket material)           

- Screws, brackets, angle trims etc

- Install fire retardant products to a total of 12 lift shafts using industrial rope access.

All products used shall have supporting data sheets.

Coshh report will be attached to Risk Assessment and Method statement.

Communication during the project is possible using 2 way radio systems.

Industrial rope haulage systems shall be created and installed to raise and lower materials and equipment when operative is in a working position.

Protection to all finished surfaces must be installed prior to access and blue shoe covers to be worn if requested.

All tools used shall be fastened to the working harness via lanyards.

Exclusion zones shall be installed using hazard signs, Harris fencing and scope of work notices supplied by GT.

GT will contribute skills, equipment and experience to ensure the project is completed safely and efficiently.

Method statement & risk assessment supplied by GT Rope Access Limited.

A complete photographic data report can be provided on completion or each phase.








Omega Red Group Limited

Patrick Fairman QS

Travel Lodge Hotel, 116 High Holborn, West London

Paul Icessan Project Manager


Installation of insulated alloy lightning cable track on various vertical elevations

Where necessary fit cross over plates and earth tags

Visually inspect latch way system

Build roof rigs and back up access systems to concrete structural columns

Provide advanced deviation systems and rope protection

Project completed thanks to Martin the steeple jack / experienced qualified rope access technician.





PIP Electrics Limited                  

Jim Ward / Bob Moore                  

Fenton House, Southfields Business Park, Basildon, Essex, SS15 6TD


Broadgate West Building Phase 2, 1 Snowdon Street, London, EC2A 2AP                  


To dismantle louver unit rotate 180 degrees and re install using tools supplied and rope access multiple rigging points backed up to structural anchor points tested at 20 tons, providing precise rope access working positioning.          

- Ensure equipment is inspected and installed correctly.                           

- Provide a safe policed working zone                                       

- Carryout the task at a methodical pace with full knowledge of risk and task.                              

Industrial rope haulage systems were created and installed to raise and lower materials and equipment when the abseil technician is in a working position.                  

GT shall supply all certifications and insurances on request.                            

All tools used shall be fastened to the working harness via lanyards.                  

Ground level zones shall be policed during any access operation.          

On request exclusion zones shall be installed using hazard signs, warning tape and scope of work notices supplied by GT.





Gerald Gardner (General Manager)                  

AESA UK Limited          

104 Maltings Place, 169 Tower Bridge Road, London, SE1 3LJ


Radissons SAS Hotel, London, Airport                           

Waltham Close, Stansted Airport, Essex, CM24 1PP, United Kingdom


Carryout a visual and textile examination to all bolted attachment points fitted to the perimeter person rider bracket plates. Fit Nyloc nuts where necessary using a ratchet spanner, tighten each spacer nut to all relevant basketry.                  

With the above works completed the continuity of the rider system fabrications will ensure a noticeable reduction in deflection / movement.                  

Inside the wine tower load test the four motorised trapezes systems using 5 x 25 kg weights and 35kg tray, total 160kg tests, each test was monitored from within the tower cap and from ground level.                             

GT recommend a metallurgist engineer (SANDBERGS) examine the fabrication of the person rider system if deflection continues.                           

Haulage systems shall be installed and all material objects raised and lowered using tailored slings.









Patrick Fairman / Chris Hopson                  

Omega Red Group Limited                  

Unit 10 Prospect Way, Hutton Industrial Estate, Brentwood, Essex, CM13 1XA          


Kings College London, WC2 2HH


Set up advanced rigging systems for GT technicians and Omega personnel.                           

Install lightning tapes as advised by Omega Supervisor David Reed.                           

Assist in daily progress meetings with Craig Eccleston of Meica, Paul Whip and Rodger Johnston of Bovis daily.





Tim Cordon (General Manager)                  

Simon Pearson (Chief Engineer)                  

Radisson SAS Hotel, London Stansted Airport, Waltham Cross, Essex, CM24 IPP


To create access to internal atria roof top tracking system (rail and roller plates to be tagged and certificated prior to project commencement ) from level 4 link bridge using industrial rope access methods.                           

Use trolley rail to traverse into suitable working positions, any further rigging will require 2 separate structural points of attachment.                           

- Clean internal glass of wine tower.                                       

- Remove each high level ventilation grill and vacuum internal filter and visible grills uniform throughout atria.                                       

- Vacuum all steelwork and ledges accessible from the internal person rider system.                                                      

- On request commission all internal atria lighting systems.                                       

- In the case of an urgent requirement for abseil access GT Rope Access Limited will guarantee a same day response.                                                    

- Industrial rope haulage systems shall be created and installed to raise and lower materials and equipment when the abseil technician is in a working position.                           

Protection to all finished surfaces must be installed prior to project commencement and blue shoe covers to be worn at all times to prevent damage to painted surfaces.








Schneider (GB) Ltd, 49 Wilkins House, Churchill Gardens, London, SW1V  3BY Schneider (GB), Stratford Eye Project, Wates C.L, Oxford Road, Stratford, E15 1BJ


Set up advanced rigging systems to concrete pillars situated above each working location on zones A and K.                           

Install horizontal gaskets and retaining clips on units at Grid T3/A and Grid T3/K.

Survey gasket at base of units and take photographic evidence to show correct seating of gasket from ground level to level 14.

This procedure will repeat on all levels.





Tim Cordon (General Manager)                  

Simon Pearson (Chief Engineer)                  

Radisson SAS Hotel, London Stansted Airport, Waltham Cross, Essex, CM24 IPP


To create access from external roof top level using two alloy roof rigg kits backed up to latch way anchorage system.                  

All equipment is lightweight and transportable. Each rigg shall be assembled on a sheet of protective material and marine plywood to protect roof surface.                  

A demonstration of the use of the equipment and sample of the high quality clean was displayed on two elevations Wednesday 11th October 2006 to John Lassaso and Simon Pearson, a bench mark standard to be uniformed on each elevation.                  

Three rope technicians and two abseil roof riggs shall target fourteen drops per working day, each drop approximately 1.8 metre wide reach.

Industrial rope haulage systems shall be created and installed to raise and lower materials and equipment when the abseil technician is in a working position.

Protection to all finished surfaces must be installed prior to project commencement and blue shoe covers to be worn at all times to prevent damage to painted surfaces.                    

A complete photographic data report can be provided on completion.








Graham Handley (Project Manager)

AESA UK Limited          

104 Maltings Place, 169 Tower Bridge Road, London, SE1 3LJ

Radissons SAS Hotel, London Airport, Waltham Close

Stansted Airport, Essex, CM24 1PP


Naracon Monorail Internal Trolley System

Using industrial rope access equipment and advanced rigging systems connect a GT operative to the internal perimeter person rider trolley rail.                           

Throughout the project a second GT operative shall police ground level if requested install cordons and signage.                   

Carryout a visual and textile examination to each bolted attachment point to perimeter person rider bracket plate system installed. With works carried out 2006 the continuity of the rider system fabrications has shown a noticeable reduction in deflection.                           

Load test carried out to 190KG with 150KG weights, 35KG basket and 6KG block tackle.

System satisfactory, read advisory notes made on GT0112 and GT0118 documents.                           

Naraco External Box Ladder System

Loaded system with a distributed total weight of 330KG.                           

The low level buffer rail requires remedial repairs in six allocated areas; unfortunately due to adverse weather conditions these works remain incomplete.                           

GT advised that an internal collar be fitted between each unsupported buffer rail end using a drill and pot rivet method. The above mechanical fixing will ensure the system maintains its continuity and prevent any further distortion damage.                  

All works carried out at a methodical pace in awareness of person safety.











Charles Cooper                  

Eye Pro Limited                  

Hollywood House, 76 Hollywood Lane, Rochester, Kent, ME3 8AR

Weymouth Court, Weymouth Street, London W1


Set up advanced rigging and pulley systems for GT technicians.                           

Carryout installation of 72 chimney cowlings as instructed by IPRO supervisor.                           

Supply IPRO with digital images on project completion.                           

All tools and materials will be placed in GT lock neck material pod bags whilst working at heights.

Exclusion zones can be installed on request, using hazard signage and warning tape.



Paul Flynn

N.D.M Limited                  

Lead Sheet Specialists                            

Metallum House, 3 Innovation Park, Manor Farm Road, Alperton, Wembley, Middlesex


Kings College London, WC2 2HH

Facing Thames River


Set up advanced rigging systems for GT technicians.                           

Carryout lead work repairs in two locations as advised by N.D.M Supervisor.                           

Supply Bovis with digital images on project completion.                           

All tools and materials will be placed in GT lock neck material pod bags whilst working at heights.








James Powell (Project Engineer)                  

Dawn Wootton (Accounts)                  

Imperial Ductwork Services Limited          

Marlowe House, Ground Floor Suite, 109 Station Road, Sidcup, Kent, DA15 7ET

Mace Project                                   


Beddington Farm Road, Croydon, London


To access rigging areas using scissor lift, connect to latch way systems.                           

Set up advanced rigging and pulley systems for GT technicians.                           

Carryout assembly of duct units and install as instructed by I.D.S. L Supervisor.                           

Supply Mace with digital images on project completion.                           

All tools and materials will be placed in GT lock neck material pod bags whilst working at heights.






Imperial

Ductwork

Services

Limited


Patrick Fairman                  

Omega Red Group Ltd                  

Dabell Avenue, Blenheim, Industrial Estate, Bulwell, Nottingham, NG6 8WA

Kings College, London, WC2 2HH


End elevation / facing Thames River


To access rigging areas using internal passenger lifts and external stair well.                           

Set up advanced rigging systems for GT technicians.                           

Carryout the removal and re-installation of two metal cowlings.                           

Supply Meica, Bovis and Alan Gibbs (Kings College) with digital images on project completion.






James Ballie Director Technical Development                  

Park Hotels Management Limited                  

Chicago Avenue, Manchester, M90 3RA, United Kingdom         


Park  Inn Hotel, St Mary’s Street Bedford, Bedfordshire, MK42 0AR


Front Elevation / Rear Elevation / Duck Mill Lane Elevation and Riverside Elevation.


To access above areas using internal passenger lifts and stair wells.                           

Install mobile alloy roof rigs and back up each to structural points.                           

Carryout a hammer test to each concrete panel on all elevations removing any loose concrete (all tools and materials are placed in GT lock neck material pod bags whilst working at heights) and collate material findings.                           

Drill sample tests and phenolphthalein tests have been undertaken and results are catalogued in the survey report.                   

Included in the survey report package is a memory key containing a PDF format of the photographic report and a word document folder containing helpful information to assist in summarising the current building condition.                                      

GT has contributed skills, equipment and experience to ensure this project has been completed safely and efficiently.                                       

Method statement & risk assessment supplied by GT Rope Access Limited.








Tim Cordon (General Manager)                  

Simon Pearson (Chief Engineer)                  

Radisson SAS Hotel, London Stansted Airport, Waltham Cross, Essex, CM24 IPP


Radisson SAS Hotel, London Stansted Airport, Waltham Close, Essex,CM24 1PP


To create access to internal atria roof top tracking system (rail and roller plates to be tagged and certificated prior to project commencement ) from level 4 link bridge using industrial rope access methods.                           

Use trolley rail to traverse into suitable working positions, any further rigging will require 2 separate structural points of attachment.


- Clean internal glass of wine tower.                                       

- Remove each high level ventilation grill and vacuum internal filter and visible grills uniform throughout atria.                                       

- Vacuum all steelwork and ledges accessible from the internal person ridersystem.

- On request commission all internal atria lighting systems.                                       

- In the case of an urgent requirement for abseil access GT Rope Access Limited will guarantee a same day response.

- Industrial rope haulage systems shall be created and installed to raise and lower materials and equipment when the abseil technician is in a working position.                           

Protection to all finished surfaces must be installed prior to project commencement and blue shoe covers to be worn at all times to prevent damage to painted surfaces.

GT shall supply all certifications and insurances on request.                                     

All tools used shall be fastened to the working harness via lanyards.                           

Ground level zones shall be policed during any access operation.                   

On request exclusion zones shall be installed using hazard signs, warning tape and scope of work notices supplied by GT.








Charles Cooper                  

Eye Pro Limited                  

Hollywood House, 76 Hollywood Lane, Rochester, Kent, ME3 8AR                  


Weymouth Court, Weymouth Street, London, W1


To access rigging areas using internal stairwell and loft opening. Connect to latch way systems before accessing roof top.                           

Set up advanced rigging and pulley systems for GT technicians.                           

Working with IPRO rig working ropes to elevation 4.                           

Carryout refurbishment works to level one cornis using rope access and a portable mobile tower.

Hammer test the rendered underside, remove any loose debris, expose steel work and grind back to clean metal, apply a suitable zinc paint product and uniform stone repairs using Portland repair mix.                           

Supply IPRO with digital images and progress reports throughout the project.                           

All tools and materials will be placed in GT lock neck material pod bags whilst working at heights.                  

Method statement & risk assessment supplied by GT Rope Access Limited.





Graham Handley (Project Manager)                  


AESA UK Limited, 104 Maltings Place, 169 Tower Bridge Road, London, SE1 3LJ


Radissons SAS Hotel, London Airport, Waltham Close

Stansted Airport, Essex, CM24 1PP


Naracon Monorail Internal Trolley System

Using industrial rope access equipment and advanced rigging systems connect a GT operative to the internal perimeter person rider trolley rail.

Throughout the project a second GT operative shall police ground level if requested install cordons and signage.

Carryout a visual and textile examination to each bolted attachment point to perimeter person rider bracket plate system installed. With works carried out 2006 the continuity of the rider system fabrications has shown a noticeable reduction in deflection.

Each bracket has six bolted fixings, a total of 216 fixings were tested and 3 were tightened.

No deflection was visible and end stops were in good order.                           


Naraco External Box Ladder System

The low level buffer rail has been drilled and fixed on every horizontal providing continuity within the structure and will prevent any further distortion damage.











John Wicks / Paul Creasey                  

Chorus Group Limited                  

Third Floor, Finsbury Tower, 103 – 105 Bunhill Row, London, EC1Y 8LR

Chorus, fourth floor, 75 Davies Street, London, W1.                           

Three        external elevations on second, third and fourth floors.


Remove the adhesive label marks and dust clean 68 glazed window units. Install beige sealants to brick work and  grey to powder coated alloy window unit surrounds. Apply grey sealants to existing lead work, a total of 68 window units in three. External elevations.

To create access the minimum requirement for anchorage is a connection that can withstand a 6 kilo Newton direct load (BS 5485), hereafter this will be referred to as safe anchorage. Safe anchorage will be made by using the existing roof cradle tracks and certificated anchor bolts.

The working ropes will be connected to bomb proof rigging strops by means of a Karabiner with a minimum breaking load of 22Kn as per CE EN362/EN12275. Each pair of working ropes will have two points of safe anchorage.

The working ropes will comprise of low stretch 10.5 or 11mm diameter Kernmantle ropes in pairs and comply with CE EN1891 with a minimum safe working load of 270kg and a breaking load of 2700kg.                           

The abseilers will connect to the pair of working ropes through their harness by means of ascending or descending devices, complying with CE EN567, EN341. Once fully equipped they will step over the parapet wall edge, then abseil to the workface. The working ropes can be deviated by using material slings attached to the fitted roof hand rails creating precise work positioning. A central haulage system will be used to feed materials and equipment to the working technicians. The attendant ground operative will provide this service; he can operate this rope from the roof or ground.                                    

The supervisor will communicate with the abseilers via two way radios.                           

If there are structural members or jagged edges these will be protected using rope protecting sleeves, reducing the damage to the ropes.

If necessary additional anchorage points will be required, this will be achieved by cables, slings or “cows tails” A cows tail being a short length of dynamic rope complying with CE EN9892 which will be attached to the harness at one end and in a karabiner at the other (Where attached to the anchor point).                  

A complete photographic data report can be provided on completion.





Graham Handley (Project Manager)                  

AESA UK Limited          

104 Maltings Place                          

169 Tower Bridge Road, London, SE1 3LJ                           


Institute Of Cancer Research, Paul O’ Gorman Building, Huntley Street, London, WC1


Using industrial rope access equipment and advanced rigging systems connect a Spanish specialist alloy welder to the internal perimeter person rider trolley rail to enable repairs to the interlinking components.

Throughout the project a second GT operative shall police ground level if requested install cordons and signage.                           

Carryout a visual and textile examination of work undertaken.

GT ROPE ACCESS LIMITED and AESA UK LIMITED have combined there skills and training to complete this project successfully and safely.                                    

GT have supplied all certifications and insurances on request.                                     

All tools used shall be fastened to the working harness via lanyards.                           

Haulage systems shall be installed and all material objects raised and lowered using tailored slings.

GT will contribute skills, equipment and experience to ensure the project is completed safely and efficiently.

A complete photographic data report can be provided on completion.